PBG Precon · Documentation
How to use PBG Precon
How to run a preconstruction review, takeoff, scope and bid analysis in PBG Precon.
01Quick start
Five steps take you from a folder of PDFs to a reviewed set with findings you can send out as RFIs. Budget about ten minutes for a typical set.
- 1Sign in with Google or an email address. Your projects are private to your account.
- 2From the projects home, create a project: name it, and add the client and address if you have them.
- 3Open the Documents tab and upload the whole sheet set at once. PBG Precon reads each sheet, pulls the sheet number, title and discipline, and indexes the text.
- 4Open Plan review and run the review. The engine cross-checks plans against schedules and notes using the Ken checklist rules.
- 5Read the findings. Each one cites verbatim text and points to the sheet it came from — click a citation to jump to the drawing. Export the RFI log when you're ready to send questions.
Do this
- Upload the entire set, including specifications, schedules and general notes — cross-sheet conflicts can only be found when both sheets are indexed.
- Give the project a name you'll recognize in a bid log, not "test".
Don't do this
- Don't run the review after uploading only the floor plans; most findings come from plan-vs-schedule comparison.
02Concepts and vocabulary
A few terms are used consistently across the app.
- Project
- A container for one bid or one building: sheets, findings, takeoff, scopes and proposals all live inside it.
- Sheet
- One page of the uploaded set. Each sheet gets a sheet number, title, discipline and extracted text.
- Document index
- The searchable text of every sheet. Review, Intelligence and Scope all read from it.
- Finding
- One issue the review engine raised: a conflict, a missing detail, a coordination risk. It has a severity, a description and at least one citation.
- Citation
- A verbatim quote from a sheet plus its location. Answers and findings are only accepted when the quote matches the sheet text character-for-character, which is what keeps the AI from inventing content.
- Checklist rule
- A reusable piece of PBG judgment (millwork, envelope, coordination) that the review engine applies to every project.
- Scale basis
- How the takeoff knows real-world dimensions on a page: a printed scale note, a graphic scale bar, or your manual calibration.
- Scope sheet
- A bid-ready inclusion/exclusion list for one trade, generated from the indexed set.
- Leveling
- Comparing subcontractor proposals line by line so you can see who is missing what before you compare prices.
03Signing in and access
PBG Precon uses Google sign-in or an email address and password. Either creates an account the first time you use it.
- 1Click Sign in in the top-right corner.
- 2Choose Continue with Google, or enter an email and password.
- 3You land on the projects home. Everything you upload from here belongs to your account only.
- Projects, sheets, findings, scopes and proposals are owner-only: nobody else — including other PBG accounts — can read them.
- The Quick takeoff workspace in the header runs without an account, but nothing is saved to a project.
04Projects and document ingest
Ingest is where the set becomes searchable. Everything downstream depends on it, so it's worth two minutes of review.
- 1Open a project and choose the Documents tab.
- 2Drag in the full set. Multi-page PDFs are split into sheets automatically; you can also drop individual sheet PDFs.
- 3Wait for each sheet to finish processing. Sheet number, title and discipline are read from the title block area.
- 4Scan the list. If a sheet came in as "Untitled" or with the wrong discipline, the title block was probably an image — see the note below.
- Text-based PDFs (exported from Revit, AutoCAD, Bluebeam) work best. Scanned or photographed sheets have no text layer, so they index as images and produce few or no citations.
- You can add sheets later — addenda, revised sheets, specifications — and re-run the review. Uploading a revision does not delete the original, so keep your naming clear.
Do this
- Upload specifications and schedules alongside the drawings; most high-value findings compare the two.
- Re-run review, scope or intelligence after adding an addendum.
Don't do this
- Don't upload photographs of printed sheets and expect citations — rescan with OCR or export a true PDF.
- Don't split one set across multiple projects; cross-sheet checks only see what's in the same project.
05Plan review
The review engine reads the indexed set the way an experienced preconstruction lead does: it looks for what disagrees, what's missing, and what will cost money later.
- 1Open the Plan review tab and click Run review.
- 2Findings appear grouped by severity — high, medium, low. High means it will change price or schedule if it isn't answered.
- 3Open a finding to read the issue, the reasoning, and the citations behind it.
- 4Click a citation to open that sheet with the quoted text highlighted on the drawing.
- 5Resolve findings you've answered, or dismiss the ones that don't apply, so the open count reflects real work.
- 6Export the RFI log to turn the remaining open findings into a numbered question list for the architect.
- Every finding must be backed by text that actually exists in the set. If the engine can't quote it, it doesn't raise it — that's deliberate.
- The open-findings count on the tab is your live punch list for the set.
Do this
- Work high severity first and turn each one into an RFI while the reasoning is in front of you.
- Re-run after an addendum and compare the new findings against the ones you already resolved.
Don't do this
- Don't treat the finding list as complete coverage. It's a strong first pass over the text, not a substitute for your own set walk.
06Intelligence (ask the set)
Intelligence answers plain questions about the project using only what the drawings and specs actually say — with the quote attached.
- 1Open the Intelligence tab.
- 2Ask a specific question: "What is the interior door hardware set at the corridor doors?" beats "Tell me about doors."
- 3Read the answer, then check the citations under it. Each is a verbatim quote from a sheet.
- 4Click a citation to jump to that sheet with the evidence highlighted.
- If the set doesn't say it, you'll get an explicit "no supported answer" rather than a guess. That's a real result — it usually means an RFI.
- Quotes are verified character-for-character against the sheet text before an answer is shown.
Do this
- Name the trade, room or sheet in your question to narrow the search.
- Use it during a subcontractor call to confirm what's shown before you commit to an answer.
Don't do this
- Don't ask for pricing or means-and-methods opinions here — Intelligence only reports what the documents say.
07Checklist (the Ken rules)
The checklist is PBG's institutional knowledge written down: the things that always get missed on millwork, envelope and trade coordination.
- 1Open the Checklist tab to see the rule library and which rules were applied to this set.
- 2Rules that produced findings link straight to those findings.
- 3Rules that produced nothing are still useful — they tell you what was checked, so you know what wasn't.
- Rules are grouped by category (millwork, envelope, coordination) and carry a severity that flows through to findings.
Do this
- Use the checklist as the agenda for your internal set review meeting.
Don't do this
- Don't assume a silent rule means the condition is fine — it may mean the sheet text was too thin to judge.
08Takeoff
The takeoff workspace turns a sheet into quantities: lengths, areas and counts, with a scale you can trust and show your work on.
- 1Open the Takeoff tab (or Quick takeoff in the header for a one-off sheet).
- 2Load a page. PBG Precon runs the auto-scale sequence: first it looks for a printed scale note like 1/4" = 1'-0", then for a graphic scale bar. If neither is found, it asks you to calibrate.
- 3Check the scale basis badge in the sidebar. It tells you which method was used and how confident it is.
- 4To calibrate manually, draw along a dimension you know — the longest one on the sheet is best — and type the real length.
- 5Measure: the length tool for linear items like trim and wall runs, the area tool for floors and finishes, the count tool for fixtures and openings.
- 6Run AI Takeoff to have quantities derived from the sheet's own text — schedules, room tags, notes. Review each proposed quantity and accept or remove it.
- Auto-scale reads what's printed on the sheet. A sheet printed to a non-standard size, or one whose note disagrees with the geometry, will read wrong — that's why the badge shows the source.
- Manual calibration always wins over the auto-detected scale.
- AI Takeoff cites its evidence. Anything without evidence should be measured by hand.
Do this
- Calibrate off the longest available dimension — short calibrations multiply their error across the sheet.
- Spot-check one AI-proposed quantity by measuring it manually before accepting the batch.
Don't do this
- Don't trust a scale badge you didn't read. Check it once per page.
- Don't measure on a scanned sheet without calibrating; the print may not be to scale.
09Estimate
The estimator converts accepted takeoff quantities into priced line items, with different logic for new construction versus remodel work.
- 1From the takeoff workspace, open the estimate dialog.
- 2Choose the job category. New construction covers sitework, foundation and framing sequencing; remodel categories assume existing conditions and demolition.
- 3Review the scale basis panel — it shows how each quantity was measured, so you know what the pricing rests on.
- 4Generate the estimate, then edit line items, quantities and unit costs directly.
- 5Export to CSV for your estimating spreadsheet.
- Unit costs are AI-generated starting points, not PBG's cost book. Replace them with your own numbers before anything goes to a client.
Do this
- Treat the output as a structured line-item skeleton you price, not as a price.
Don't do this
- Don't send a generated estimate to an owner without repricing it.
10Scope
Scope produces a bid-ready trade scope sheet from the indexed set: what's included, what isn't, and what still needs an answer.
- 1Open the Scope tab and pick a trade — plumbing, electrical, drywall, and so on.
- 2Generate the scope sheet. The engine reads every sheet in the set for that trade's work.
- 3Read the four blocks: inclusions, exclusions, clarifications and allowances. Each is backed by a citation.
- 4Export the scope sheet as text to paste into your bid package, or keep it in saved history and regenerate after an addendum.
- Clarifications are the questions the documents don't answer — those usually become RFIs or bid qualifications.
- Saved scopes stay with the project so you can diff them after a revision.
Do this
- Send the scope sheet to the sub with the bid package so both sides scope the same work.
Don't do this
- Don't publish a scope sheet without reading its exclusions; that's where the money hides.
11Bid
Bid takes the proposals you receive, normalizes them into comparable line items, and levels them against each other.
- 1Open the Bid tab and upload a proposal: PDF, Excel or CSV. Enter the vendor name.
- 2Wait for extraction — the proposal is parsed into structured line items with descriptions, quantities and prices.
- 3Review the extracted line items and correct anything the parser misread.
- 4Upload the remaining proposals for that trade, then run the analysis.
- 5Read the leveling view: side-by-side pricing, coverage gaps (work one bidder priced and another didn't), and exclusion risk (language that shifts scope back to you).
- Comparison is only meaningful once at least two proposals for the same trade are loaded.
- Pair Bid with the trade's Scope sheet: the scope defines what should be covered, the analysis shows who covered it.
Do this
- Upload the proposal exactly as received — don't pre-summarize it, the parser needs the original language for exclusions.
- Check the coverage gaps before comparing bottom-line numbers.
Don't do this
- Don't award off the leveled total alone; read the exclusion flags first.
12Best practices and troubleshooting
Common situations and what to do about them.
- The review found almost nothing
- Usually an incomplete index. Confirm the specifications and schedules were uploaded, and that sheets aren't scans without a text layer.
- A finding cites the wrong sheet
- Check the sheet's number and discipline in Documents. A misread title block sends citations to the wrong place.
- Intelligence says there's no supported answer
- The set genuinely doesn't state it. That's an RFI, not a bug.
- Measurements are off by a consistent factor
- The scale basis is wrong. Recalibrate manually against a long known dimension.
- A proposal extracted badly
- Scanned or heavily formatted proposals parse worst. Re-upload a text PDF or a CSV export if the vendor can provide one.
- Results feel stale after an addendum
- Uploading sheets doesn't automatically re-run anything. Re-run review, regenerate the affected scope sheets, and re-ask any Intelligence question that mattered.
- Before anything leaves the office
- Every AI output in this app is evidence-backed but not authoritative. Verify quantities, prices and exclusions against the documents before they go into a bid, an RFI or a contract.